Osisko Development Completes 13,000-Meter Infill Drilling Program at Cariboo Gold Project and Provides Update on Ongoing Lowhee Underground Drilling; Intercepts Include 44.68 g/t Gold Over 1.5 Meters From 27.9 Meters Downhole, Including 133.62 g/t Gold Over 0.5 Meters From 28.4 Meters Downhole
HIGHLIGHTS 13,684 m of grid infill drilling completed (2,659 m new results) on 10-m drill spacing in 142 drill holes from August 2025 representing the...